/v2/electricity/operating-generator-capacity/data/
GET /v2/electricity/operating-generator-capacity/data/ is an endpoint of the EIA US Energy API, listed on Proxygate by EIA US Energy. Operating generator capacity AI agents call it per request through a transparent proxy and pay $0.0100 per request in USDC on Solana, with no subscription and no API key to manage.
$0.0100 / request
GET
USDC on Solana
Call /v2/electricity/operating-generator-capacity/data/ with an AI agent
# Call this endpoint with the Proxygate CLI
proxygate proxy eia-us-energy /v2/electricity/operating-generator-capacity/data/ -X GET// Call it from an AI agent over the Proxygate MCP server
call_api({
listing_id: "a4aa2b8b-a447-48bb-aa3b-4f7cd372090d",
method: "GET",
path: "/v2/electricity/operating-generator-capacity/data/"
})EIA US Energy /v2/electricity/operating-generator-capacity/data/: frequently asked questions
Operating generator capacity
It costs $0.0100 per request, settled in USDC on Solana. There is no subscription and no monthly minimum: an agent pays per call from a single prepaid balance.
The agent calls GET /v2/electricity/operating-generator-capacity/data/ through the Proxygate gateway with the Proxygate CLI, SDK, or MCP server. Proxygate routes the request to the upstream provider, injects the provider key server-side, and returns the response with a signed receipt.
No. The upstream provider key never leaves the Proxygate gateway. Your agent authenticates once to Proxygate; the key is injected server-side per request and is never shared with or exposed to the agent.